{"id":13499,"date":"2026-05-05T07:00:00","date_gmt":"2026-05-05T05:00:00","guid":{"rendered":"https:\/\/deltaagile.com\/?p=13499"},"modified":"2026-05-24T13:21:10","modified_gmt":"2026-05-24T11:21:10","slug":"pm%c2%b2-the-european-commissions-project-approach","status":"publish","type":"post","link":"https:\/\/deltaagile.com\/en\/pm%c2%b2-the-european-commissions-project-approach\/","title":{"rendered":"PM\u00b2 &#8211; The European Commission&#8217;s project approach"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"13499\" class=\"elementor elementor-13499 elementor-13466\" data-elementor-post-type=\"post\">\n\t\t\t\t<div data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-element elementor-element-404333b e-flex e-con-boxed e-con e-parent\" data-id=\"404333b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-94fce04 elementor-widget elementor-widget-text-editor\" data-id=\"94fce04\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Large corporate systems often tend to standardise project approaches. Sometimes this is justified and simplifies processes, but sometimes it is driven by mistrust and a desire for control. Outcomes depends on circumstances such as diversification of product and service portfolio, geographical spread, regulatory frameworks and availability of resources.   <span style=\"color: #ffffff;\">PM\u00b2<\/span><\/p><p>Public administrations and international organizations face all of the aforementioned challenges and add some of their own, such as local support for initiatives, differing political interests, and corruption.<\/p><p>In such an environment, the introduction of a single project methodology (despite the benefits it can bring) is a very challenging task. On one hand, such a methodology needs to establish a solid hierarchy of decision-making and accountability. On the other hand, it has to recognise that we are living in the 21st century and that management of successful technology initiatives is practically the antithesis of hierarchy and reporting.   <\/p><p>The European Commission became aware of these challenges almost twenty years ago and sponsored the development of a project methodology called PM\u00b2 <em>(PM square)<\/em>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fafd39a elementor-widget elementor-widget-heading\" data-id=\"fafd39a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Evolution of the methodology<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f0292ba elementor-widget elementor-widget-heading\" data-id=\"f0292ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Waterfall phase<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac00de5 elementor-widget elementor-widget-text-editor\" data-id=\"ac00de5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The development of PM\u00b2 started in 2007 within the European Commission as an internal approach for IT project management. The reason was the need for a single, pragmatic and lightweight methodology adapted to the complex institutional environment of the EU. Which was not adequately covered at the time by either <a href=\"https:\/\/www.prince2.com\/eur\" target=\"_blank\" rel=\"noopener\">PRINCE2<\/a> or <a href=\"https:\/\/www.pmi.org\/standards\/pmbok\" target=\"_blank\" rel=\"noopener\">PMBOK<\/a>. The first version of PM\u00b2 was presented in 2008 and then piloted in selected European Commission projects in 2009, supported by in-house training.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb3b50b elementor-widget elementor-widget-heading\" data-id=\"bb3b50b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Agile add-on<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1921c82 elementor-widget elementor-widget-text-editor\" data-id=\"1921c82\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In 2014, the European Commission introduced Agile@EC (later PM\u00b2-Agile), which added agile principles to the existing PM\u00b2 framework for managing technological development projects. It was only with this addition that PM\u00b2 actually became suitable for managing IT projects &#8211; which is what it was intended to do from the start. In practice, at this point the operational PM\u00b2 approach split into two branches:  <\/p><ul><li>PM\u00b2 for the management of traditional projects such as railways or bridges<\/li><li>PM\u00b2-Agile for managing development projects, especially in IT<\/li><\/ul><p>Given my predominant interest, I will focus on PM\u00b2-Agile in this article.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-20912fa elementor-widget elementor-widget-heading\" data-id=\"20912fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Open standard<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7b51ac7 elementor-widget elementor-widget-text-editor\" data-id=\"7b51ac7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>A key moment in the history of PM\u00b2-Agile was in 2016, when the European Commission released the<a href=\"https:\/\/op.europa.eu\/en\/publication-detail\/-\/publication\/ac3e118a-cb6e-11e8-9424-01aa75ed71a1\/language-en\" target=\"_blank\" rel=\"noopener\">&#8220;PM\u00b2 Guide &#8211; Open Edition<\/a>&#8221; under an open licence. With this, PM\u00b2: <\/p><ul><li>was made freely accessible to the public,<\/li><li>went beyond the narrow confines of the EU institutions,<\/li><li>became useful for Member States, their public administrations, contractors and the private sector.<\/li><\/ul><p>This initiative, known as <a href=\"https:\/\/pm2alliance.eu\/the-openpm2-initiative\/\" target=\"_blank\" rel=\"noopener\">Open PM\u00b2<\/a>, was formally extended in 2017, when the Commission started to actively promote the external use of the methodology.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5ee0108 elementor-widget elementor-widget-heading\" data-id=\"5ee0108\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">PM\u00b2 Alliance<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4ed08f2 elementor-widget elementor-widget-text-editor\" data-id=\"4ed08f2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In 2018, the PM\u00b2 Guide v3.0 was released and the first Open PM\u00b2 Conference was organised. In the same year, the <a href=\"https:\/\/pm2alliance.eu\/\" target=\"_blank\" rel=\"noopener\">PM\u00b2 Alliance<\/a>, an independent international community of practitioners supporting knowledge sharing, events and the dissemination of the methodology beyond the European Commission, was established. During this period, PM\u00b2 received support from European programmes (ISA\u00b2, later Digital Europe), consolidating its role as a European reference project standard.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-07a9730 elementor-widget elementor-widget-heading\" data-id=\"07a9730\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What are PM\u00b2 and PM\u00b2-Agile<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1f5e67a elementor-widget elementor-widget-text-editor\" data-id=\"1f5e67a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>PM\u00b2 and PM\u00b2-Agile do not bring anything new to the waterfall and agile practices. They are just clear, concise descriptions of the PMP project approach for waterfall and the <a href=\"https:\/\/deltaagile.com\/en\/shop\/\" target=\"_blank\" rel=\"noopener\">Scrum<\/a> and Lean practices for agile. <\/p><p>A couple of examples from PM\u00b2\/PM\u00b2-Agile:<\/p><ul><li>Waterfall is divided into initiation, planning, execution, closure and monitoring phases<\/li><li>It uses established waterfall practices such as WBS, phase gates, project plan, RASCI matrices, risk plan, etc.<\/li><li>Agile teams are structured similarly to Scrum teams, but some roles are named differently:<ul><li>Developer &#8211; Agile Team Member (ATeM)<\/li><li>Scrum Master &#8211; Team Coordinator (TeCo)<\/li><li>Product Owner &#8211; Product Owner (PrOw)<\/li><li>Architect &#8211; Architecture Owner (ArOw)<\/li><\/ul><\/li><li>Agile teams iteratively develop prototypes and MVPs, estimate the size of work packages with planning poker, perform demos of product increments at the end of iterations, etc.<\/li><\/ul><p>In addition, PM\u00b2 adds an organisational superstructure for <a href=\"https:\/\/op.europa.eu\/en\/publication-detail\/-\/publication\/66d131c9-8b8c-11eb-b85c-01aa75ed71a1\/language-en\" target=\"_blank\" rel=\"noopener\">programme<\/a> and <a href=\"https:\/\/op.europa.eu\/en\/publication-detail\/-\/publication\/e6b94ceb-d4c2-11ec-a95f-01aa75ed71a1\/language-en\" target=\"_blank\" rel=\"noopener\">portfolio<\/a> management.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9f2cc6a elementor-widget elementor-widget-heading\" data-id=\"9f2cc6a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Why do I believe PM\u00b2 is a useful methodology?<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-26058e7 elementor-widget elementor-widget-text-editor\" data-id=\"26058e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The real innovation that the approach brings to the project world is a core organisational structure that is common to both PM\u00b2 and PM\u00b2-Agile.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-056c6b7 elementor-widget elementor-widget-image\" data-id=\"056c6b7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"648\" src=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2-1024x648.jpg\" class=\"attachment-large size-large wp-image-13471\" alt=\"PM2\" srcset=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2-1024x648.jpg 1024w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2-300x190.jpg 300w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2-768x486.jpg 768w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2-600x380.jpg 600w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/PM2.jpg 1207w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-782b525 elementor-widget elementor-widget-text-editor\" data-id=\"782b525\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In this structure, agile development practices such as Scrum are represented in the Project Core Team (PCT). Product Discovery practices, which support agile development and ensure that the product has business value, are practised at all three lower levels. <\/p><p>PM\u00b2 integrates agile practices into the traditional hierarchical organisation of government bodies. Although not ideal, in my opinion it is the underlying PM\u00b2 organisational structure that positions the approach as the best candidate for introducing agile processes into public administration projects. At first glance, the structure may seem complex, but it is much simpler than, for example, SAFe, which is its corporate competitor.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-650055b elementor-widget elementor-widget-image\" data-id=\"650055b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"978\" height=\"678\" src=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SAFe.jpg\" class=\"attachment-large size-large wp-image-13473\" alt=\"PM2\" srcset=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SAFe.jpg 978w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SAFe-300x208.jpg 300w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SAFe-768x532.jpg 768w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SAFe-600x416.jpg 600w\" sizes=\"(max-width: 978px) 100vw, 978px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94fb4e6 elementor-widget elementor-widget-text-editor\" data-id=\"94fb4e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The roles represented in PM\u00b2 are:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d9d4995 elementor-widget elementor-widget-image\" data-id=\"d9d4995\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"677\" src=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN-1024x677.jpg\" class=\"attachment-large size-large wp-image-13475\" alt=\"PM2\" srcset=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN-1024x677.jpg 1024w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN-300x198.jpg 300w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN-768x508.jpg 768w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN-600x397.jpg 600w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/04\/PM2-roles-EN.jpg 1050w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d5e7762 elementor-widget elementor-widget-text-editor\" data-id=\"d5e7762\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>PM\u00b2 positions itself as a flexible project framework that adapts to organisational needs. In my opinion, at least for small and medium-sized IT development projects, several of the roles described above will often be combined into a single role. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69f7bdb elementor-widget elementor-widget-image\" data-id=\"69f7bdb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"531\" src=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog-1024x531.jpg\" class=\"attachment-large size-large wp-image-13477\" alt=\"PM2\" srcset=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog-1024x531.jpg 1024w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog-300x156.jpg 300w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog-768x398.jpg 768w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog-600x311.jpg 600w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/Zdruzevanje-vlog.jpg 1207w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ad47ded elementor-widget elementor-widget-text-editor\" data-id=\"ad47ded\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>On the client&#8217;s side, the responsibilities of the Project Owner, Business Manager and Product Owner will probably be merged into one for the sake of rationality.<\/li><li>On the contractor&#8217;s side, the responsibilities of the roles of Solution Provider (i.e. the person, not the organisation) and Project Manager will be combined. In the extreme case, this person will also take on the role of Scrum Master. <\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6ba8272 elementor-widget elementor-widget-heading\" data-id=\"6ba8272\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The reality of PM\u00b2 adoption<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e376b27 elementor-widget elementor-widget-text-editor\" data-id=\"e376b27\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Outside the European Institutions, in the public administrations of the Member States, PM\u00b2 is not yet as widespread as the European Commission would like it to be. Poland is the furthest along this path, followed by Greece with individual initiatives. <\/p><p>As a consequence of encouraging the use of the PM\u00b2-Agile approach, certain Member States have succeeded in including the specifics of the Agile project approach in the public procurement legislation. Examples are incremental funding and assessing the success of initiatives based on KPIs of generated business value rather than the amount of realised solution functionalities. The suitability of Member States&#8217; legislations for &#8220;innovation procurement&#8221; is described in <a href=\"https:\/\/ec.europa.eu\/assets\/rtd\/innovation-procurement\/country-report-2024-policy-benchm-slovenia.pdf\" target=\"_blank\" rel=\"noopener\">the European Commission&#8217;s 2024 report<\/a>, which ranks Slovenia 18th.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-90cf49b elementor-widget elementor-widget-image\" data-id=\"90cf49b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija-1024x614.jpg\" class=\"attachment-large size-large wp-image-13479\" alt=\"PM2\" srcset=\"https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija-1024x614.jpg 1024w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija-300x180.jpg 300w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija-768x461.jpg 768w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija-600x360.jpg 600w, https:\/\/deltaagile.com\/wp-content\/uploads\/2026\/05\/SI-pozicija.jpg 1425w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-21ab874 elementor-widget elementor-widget-heading\" data-id=\"21ab874\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Conclusion<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c0bd36f elementor-widget elementor-widget-text-editor\" data-id=\"c0bd36f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>PM\u00b2-Agile&#8217;s unique structure makes it a good basis for managing complex IT development initiatives in public sector. It contains all the elements that make agile approaches effective on both the pure development and product side. <\/p><p>At a time when Europe is re-establishing its sovereignty, a unified project approach is a desirable tool to optimise much-needed innovation and development initiatives.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Large corporate systems often tend to standardise project approaches. Sometimes this is justified and simplifies processes, but sometimes it is driven by mistrust and a desire for control. Outcomes depends on circumstances such as diversification of product and service portfolio, geographical spread, regulatory frameworks and availability of resources. PM\u00b2 Public administrations and international organizations face [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13468,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[69],"tags":[],"class_list":["post-13499","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-basics"],"_links":{"self":[{"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/posts\/13499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/comments?post=13499"}],"version-history":[{"count":6,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/posts\/13499\/revisions"}],"predecessor-version":[{"id":13542,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/posts\/13499\/revisions\/13542"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/media\/13468"}],"wp:attachment":[{"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/media?parent=13499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/categories?post=13499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/deltaagile.com\/en\/wp-json\/wp\/v2\/tags?post=13499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}